dormakaba Holding AG / Key word(s): ESG dormakaba reduces CO2 emissions: Commissioning of 21,000 solar panels at three production sites 01.02.2024 / 06:30 CET/CEST Rümlang, 1 February 2024 – In the last three months, dormakaba has started operating three photovoltaic power plants with a total of 21,000 solar panels on the roofs of its production sites in Melaka (Malaysia), Suzhou (China), and Taishan (China). The solar installations are planned to produce more than 11,000 megawatt hours (MWh)...